Contact Information

Main Street Bridge Railing Renderings For November 14th Public Hearing

We have received new renderings of the two railings styles under consideration for the Main Street Bridge reconstruction in 2019.  The two railing styles are the Texas C2P and the MassDOT S3-TL4.  Multiple views of each railing are rendered in the slide show below.

This slideshow requires JavaScript.

 

 

Minutes of the three previous Parks Meetings dedicated to Main Street Bridge design elements are available below.

2017-09-26 Parks Minutes

2017-10-10 Parks Minutes

2017-10-24 Parks Minutes