Advertisement For Bids/Public Notice For Bidders: Riverside Park Walking Path Improvements

Sealed bids will be received at the Chief Administrator’s Office, Village Hall, 21 West Washington Street, Chagrin Falls, Ohio 44022 until 12:00 p.m. Noon on September 14, 2017 and will be opened and read immediately thereafter for the

RIVERSIDE PARK WALKING PATH IMPROVEMENTS

OPINION OF PROBABLE CONSTRUCTION COST: $100,000.00

COMPLETION DATE: MAY 15, 2018

Bids must be in accordance with specifications and on forms available from CT Consultants, Inc., 8150 Sterling Court, Mentor, Ohio 44060 at a non-refundable cost of One Hundred Dollars ($100.00) picked up or One Hundred Twenty Five Dollars ($125.00) mailed.

The bid specifications, drawings, plan holders list, addenda, and other bid information may be obtained via the internet at www.ctconsultants.com/bidinfo/index.html . The bidder shall be responsible to check for Addenda and obtain same from the web site.

Addendum #1 added September 11 2017

 

SECTION 01010CT – SUMMARY OF WORK

PART 1 – GENERAL

1.1 PROJECT LOCATION

A. The project is located in Riverside Park, Chagrin Falls, adjacent to the Cuyahoga County Public Library branch at 100 East Orange Street.

1.2 PROJECT DESCRIPTION

A. The bid documents contain a bid form for one (1) contract. The bidder must bid on the Base Bid and both Alternates. If an Alternate is awarded, it will be either A or B but not both.

B. The project consists of installing a new brick path adjacent to the existing steps at the library, starting at the parking lot and extending south down the hill to the bottom of the hill. The project includes some segmental retaining walls, permeable brick pavers, bio-retention basins and landscaping.

1.3 SPECIFICATIONS

A. In general, these Specifications describe the work to be performed by the various trades, other than work specifically excluded. It shall be the responsibility of the Contractor and Subcontractors to perform all work incidental to their trade, whether or not specific mention is made of each item, unless such incidentals are included under another Item.

B. It is advised that the Contractor and all Subcontractors familiarize themselves with the contents of the complete Specifications, particularly for the trades preceding, following, related or adjacent to their work.

1.4 DRAWING SCHEDULE

A. The work to be done under this contract is shown on the following Drawings: